Code of Federal Regulations (Last Updated: November 8, 2024) |
Title 40 - Protection of Environment |
Chapter I - Environmental Protection Agency |
SubChapter C - Air Programs |
Part 75 - Continuous Emission Monitoring |
Subpart A - General |
§ 75.1 - Purpose and scope. |
§ 75.2 - Applicability. |
§ 75.3 - General Acid Rain Program provisions. |
§ 75.4 - Compliance dates. |
§ 75.5 - Prohibitions. |
§ 75.6 - Incorporation by reference. |
§ 75.7 - EPA Study. |
§ 75.8 - Relative accuracy and availability analysis. |
§§ 75.7--75.8 - [Reserved] |
Subpart B - Monitoring Provisions |
§ 75.10 - General operating requirements. |
§ 75.11 - Specific provisions for monitoring SO2 emissions. |
§ 75.12 - Specific provisions for monitoring NOX emission rate. |
§ 75.13 - Specific provisions for monitoring CO2 emissions. |
§ 75.14 - Specific provisions for monitoring opacity. |
§ 75.15 - [Reserved] |
§ 75.16 - Special provisions for monitoring emissions from common, bypass, and multiple stacks for SO2 emissions and heat input determinations. |
§ 75.17 - Specific provisions for monitoring emissions from common, bypass, and multiple stacks for NOX emission rate. |
§ 75.18 - Specific provisions for monitoring emissions from common and by-pass stacks for opacity. |
§ 75.19 - Optional SO2, NOX, and CO2 emissions calculation for low mass emissions (LME) units. |
Subpart C - Operation and Maintenance Requirements |
§ 75.20 - Initial certification and recertification procedures. |
§ 75.21 - Quality assurance and quality control requirements. |
§ 75.22 - Reference test methods. |
§ 75.23 - Alternatives to standards incorporated by reference. |
§ 75.24 - Out-of-control periods and adjustment for system bias. |
Subpart D - Missing Data Substitution Procedures |
§ 75.30 - General provisions. |
§ 75.31 - Initial missing data procedures. |
§ 75.32 - Determination of monitor data availability for standard missing data procedures. |
§ 75.33 - Standard missing data procedures for SO2, NOX, and flow rate. |
§ 75.34 - Units with add-on emission controls. |
§ 75.35 - Missing data procedures for CO2.. |
§ 75.36 - Missing data procedures for heat input rate determinations. |
§ 75.37 - Missing data procedures for moisture. |
§ 75.38 - [Reserved] |
§ 75.39 - [Reserved] |
§§ 75.38--75.39 - [Reserved] |
Subpart E - Alternative Monitoring Systems |
§ 75.40 - General demonstration requirements. |
§ 75.41 - Precision criteria. |
§ 75.42 - Reliability criteria. |
§ 75.43 - Accessibility criteria. |
§ 75.44 - Timeliness criteria. |
§ 75.45 - Daily quality assurance criteria. |
§ 75.46 - Missing data substitution criteria. |
§ 75.47 - Criteria for a class of affected units. |
§ 75.48 - Petition for an alternative monitoring system. |
Subpart F - Recordkeeping Requirements |
§ 75.50 - General recordkeeping provisions. |
§ 75.51 - General recordkeeping provisions for specific situations. |
§§ 75.50--75.52 - [Reserved] |
§ 75.52 - Certification, quality assurance and quality control record provisions. |
§ 75.53 - Monitoring plan. |
§ 75.54 - General recordkeeping provisions. |
§ 75.55 - General recordkeeping provisions for specific situations. |
§ 75.56 - Certification, quality assurance and quality control record provisions. |
§ 75.57 - General recordkeeping provisions. |
§ 75.58 - General recordkeeping provisions for specific situations. |
§ 75.59 - Certification, quality assurance, and quality control record provisions. |
§§ 75.54--75.56 - [Reserved] |
Subpart G - Reporting Requirements |
§ 75.60 - General provisions. |
§ 75.61 - Notifications. |
§ 75.62 - Monitoring plan submittals. |
§ 75.63 - Initial certification or recertification application. |
§ 75.64 - Quarterly reports. |
§ 75.65 - Opacity reports. |
§ 75.66 - Petitions to the Administrator. |
§ 75.67 - Retired units petitions. |
§ 75.68 - Temporary modifications to otherwise applicable quality-assurance requirements during the COVID-19 national emergency. |
Subpart H - NOX Mass Emissions Provisions |
§ 75.70 - NOX mass emissions provisions. |
§ 75.71 - Specific provisions for monitoring NOX and heat input for the purpose of calculating NOX mass emissions. |
§ 75.72 - Determination of NOX mass emissions for common stack and multiple stack configurations. |
§ 75.73 - Recordkeeping and reporting. |
§ 75.74 - Annual and ozone season monitoring and reporting requirements. |
§ 75.75 - Additional ozone season calculation procedures. |
Subpart I - Hg Mass Emission Provisions |
§ 75.80 - General provisions. |
§ 75.81 - Monitoring of Hg mass emissions and heat input at the unit level. |
§ 75.82 - Monitoring of Hg mass emissions and heat input at common and multiple stacks. |
§ 75.83 - Calculation of Hg mass emissions and heat input rate. |
§ 75.84 - Recordkeeping and reporting. |
Appendix K to Part 75 - Quality Assurance and Operating Procedures for Sorbent Trap Monitoring Systems |
Appendix 6 - Procedure for Converting Volumetric Flow to STP |
Appendix A to Part 75 - Specifications and Test Procedures |
Appendix B to Part 75 - Quality Assurance and Quality Control Procedures |
Appendix C to Part 75 - Missing Data Estimation Procedures |
Appendix D to Part 75 - Optional SO2 Emissions Data Protocol for Gas-Fired and Oil-Fired Units |
Appendix E to Part 75 - Optional NOX Emissions Estimation Protocol for Gas-Fired Peaking Units and Oil-Fired Peaking Units |
Appendix F to Part 75 - —Conversion Procedures |
Appendix G to Part 75 - Determination of CO2 Emissions |
Appendix H to Part 75 - Revised Traceability Protocol No. 1 |
Appendix H to Part 75 - Revised Traceability Protocol No. 1 [Reserved] |
Appendix I to Part 75 - Optional F - Factor/Fuel Flow Method |
Appendix I to Part 75 - Optional F - Factor/Fuel Flow Method [Reserved] |
Appendix J to Part 75 - Compliance Dates for Revised Recordkeeping Requirements and Missing Data Procedures |
Appendix J to Part 75 - Compliance Dates for Revised Recordkeeping Requirements and Missing Data Procedures [Reserved] |